Annex B 4.20.2 (b)
Principle 1: Order of frequency block assignment is based on the Assignment Priority of a Bidder which is determined by its Valid Bid amount at the Assignment Phase. Principle 2: Bidders will be assigned with contiguous Frequency Blocks successfully bid as far as practicable;
Principle 3: If assignment of more than 100 MHz in either the Upper Band or Lower Band to any Bidder is inevitable, Bidder(s) with a higher Valid Bid amount at the Assignment Phase will be afforded higher priority to be assigned with contiguous Frequency Blocks with bandwidth exceeding 100 MHz.